Analysing market data
Fetching listings · computing fair value · building charts
Analysing market data
Fetching listings · computing fair value · building charts
Market Intelligence
Electric
30 days avg on market · Low data confidence
Listing price range
€33k – €36k
25th to 75th percentile
Listings
5
ROI active now
Updated 5h ago · ROI · Low confidence
Median listing price
€32,950
private sale ~€31,078 Pricing assumptionsAssumptions· Good condition, full service history· No outstanding finance or damage· Based on ads seen in the past 30 days
Est. trade-in
€23,030 – €27,965
15–30% below private sale
Avg mileage
7k km
typical 6k km
Days listed
30d
avg on market · demand 49/100
AI-generated analysis · Carintel.ie · verify independently before purchasing
2025 MG S5 · Electric · per year
Estimated annual cost
€7,384/yr
Per month
€615/mo
Depreciation
€6,261
85% of total
Fuel / electricity
€490
7% of total
Maintenance
€280
4% of total
Road tax
€120
2% of total
Charger (annualised)
€233
3% of total
Assumptions: Depreciation based on €32,950 current market median at 19.0%/yr (regression from 5 listings across multiple years). Fuel cost assumes 16,000 km/yr (CSO Ireland average), Irish fuel prices. Road tax uses Irish CO2-based motor tax bands (WLTP regime). Maintenance is an AI estimate based on typical independent garage rates for this model. Home charger cost (€700 typical after SEAI grant) annualised over 3 years.
16,000 km/yr · Ireland rates
MG S5 2025, all powertrain variants
Market-level estimateAll available fuel types sorted cheapest to run · WLTP figures where available · current market highlighted
18.0 kWh/100 km, home night rate
median €32,950
Assumptions: 16,000 km/yr (CSO Ireland average). Fuel: petrol €2.00/L, diesel €2.20/L. EV: smart-night €0.17/kWh (80%), day €0.30/kWh (20%). PHEV split: 45% electric, 55% petrol. WLTP consumption figures used where available; real-world usage is typically 10-20% higher. Road tax uses Irish CO2-based motor tax bands (WLTP regime, 2021+ registrations).
Home EV charger setup
The smart-night savings above require a home charger. Without one, you'll charge on public networks at significantly higher rates.
Installed cost
€800 – €1,500
7 kW charger + installation
SEAI grant
−€300
You pay €500 – €1,200 after grant
Public charging
€0.41 – €0.60/kWh
ecar.ie · ESB eCars network
AI estimate · Irish independent garage rates
€280
estimated per year
MG S5 maintenance is significantly simpler than ICE vehicles, with no oil changes, timing components, or transmission servicing required; however, battery management reliability and 12V auxiliary battery durability are potential cost wildcards, and specialist diagnostic equipment may be harder to access at independent garages.
AI-generated estimate · costs vary by usage and service history · not a financial forecast
industry average
Live market data not yet available for this segment. Industry rate: 19.0%/yr for MG. Not a financial forecast.
Found this useful?
Sign up to our mailing list to stay up to date on new developments and features.